§ 11.04.02. Rate schedule.  


Latest version.
  • COMMERCIAL AND RESIDENTIAL PERMIT FEES
    A. Schedule of Building Permit Fees for One and Two Family Dwellings
    1. New building $0.10 per square foot of area under roof with a minimum of $150.00
    2. Addition $0.10 per square foot of area under roof with a minimum of $35.00
    3. Accessory building $0.10 per square foot of area under roof with a minimum of $30.00
    4. Re-inspections and additional inspections
    (*see note below)
    $30.00 per inspection
    5. Work commencing before permit issuance Permit fee shall be doubled
    B. Schedule of Building Permit Fees for All Other than One and Two Family Dwellings, Including: Commercial, Industrial, and Apartment Complexes
    1. New building $0.11 per square foot under roof with a minimum of $200.00
    2. Addition $0.11 per square foot under roof with a minimum of $35.00
    3. Accessory building $0.11 per square foot under roof with a minimum of $40.00
    4. Re-inspections $30.00 per inspection
    5. Work commencing before permit issuance Permit fee shall be doubled
    6. Commercial plan review When the valuation of the proposed construction exceeds $100,000.00 a plan review fee shall be paid at a rate equal to one-half the building permit fee with a maximum plan review fee of $5,000.00. The plan review fee shall be charged at the time of submittal of the building permit. The application is a non-refundable fee.
    Projects containing multiple buildings which are submitted on a single set of plans for plan review, shall have the plan review fee based upon a building permit fee calculated using the total square footage of the proposed buildings included in the plans submitted for review.
    C. Schedule of Electrical Permit Fees
    1. Electrical systems, all new construction, additions and accessory buildings $0.11 per square foot of area under roof, with a minimum of $30.00 whichever is greater
    2. Electrical systems, renovations, alterations and repairs $30.00 per inspection for two inspections,
    additional inspections $20.00 each
    3. Electrical service only, service change outs or electrical service upgrades $30.00
    4. Temporary service pole $30.00
    5. TPP (temporary power to structure prior to final inspection) Minimum electrical fee $30.00
    6. Re-inspections and additional inspections
    (*see note below)
    $30.00
    7. Alternative energy systems—Panels, fuel cells, wind generators, etc. Minimum $30.00 electrical fee plus $25.00 solar for each system
    8. Work commencing before permit issuance Permit fee shall be doubled
    D. Schedule of Plumbing Permit Fees
    l. Plumbing systems for new construction, additions and accessory buildings $0.09 per square foot of area under roof, with a minimum of $40.00 whichever is greater
    2. Remodel, renovation, alterations, replacement and repairs Minimum $30.00 plumbing fee plus fees for fixtures as noted below
     a. Plumbing fixtures $3.50 each
     b. Water heater $10.00 each
    3. Re-inspections and additional inspections
    (*see note below)
    $30.00
    E. Schedule of Fuel Gas Permit Fees
    1. Gas service line per meter $30.00
    2. Re-inspection or additional inspections $30.00 per inspection
    3. Work commencing before permit issuance Permit fee shall be doubled
    F. Schedule of Mechanical Permit Fees
    1. Heating and cooling system for new construction, additions and accessory buildings $0.09 per square foot of area under roof, with a minimum of $60.00 whichever is greater
    2. Remodel, renovations, alterations, replacement and repairs $40.00
    G. Other Mechanical Fees
    1. Boilers $60.00 for one boiler + $15.00 for each additional boiler
    2. Commercial vent hoods and exhaust systems $60.00 for one exhaust system + $15.00 for each additional system
    3. Ductwork $60.00 for one system + $35.00 for each additional system
    4. HVAC change out/repair $60.00 for one unit + $25.00 for each additional unit
    5. Re-inspections and additional inspections
    (*see note below)
    $30.00 per inspection
    6. Work commencing before permit issuance Permit fee shall be doubled

     

    PERMIT FOR WORK IN THE STREET RIGHT-OF-WAY OR CITY EASEMENT
    1. Permit fee $50.00
     *Note: Re-inspections will not be rescheduled until each re-inspection fee for each trade that failed inspection has been paid.

     

( Ord. No. 2012-09, § 1, 3-29-2012 ; Ord. No. 2016-25 , § 1, 11-29-2016)

Editor's note

Ord. No. 2012-09, § 3, adopted March 29, 2012 , repealed §§ 11.04.02 and 11.04.03 in their entirety, and added a new § 11.04.02 as set out herein. Former §§ 11.04.02 and 11.04.03 pertained to repeal of ordinances and rate schedule, respectively, and derived from Ord. No. 2006-6, §§ 1, 2, adopted February 9, 2006 .